The FRI-EL GREEN POWER subsidiary, ALERION CLEAN POWER, operates the “Medio Campidano” wind farm (30,8 MW)

Milan – December 2018  - ALERION CLEAN POWER, a subsidiary of FRI-EL GREEN POWER, operates the wind farm “Medio Campidano” Green Energy Sardegna Srl, located in the municipalities of Villacidro und San Gavino Monreale. Installed power 30,8 MW which produces clean energy equivalent to the energy needs of about 30,000 families.

With this additional wind farm, the FRI-EL Group reaches 592 MW of gross installed wind capacity in Italy.

For further information www.alerion.it