The FRI-EL GREEN POWER subsidiary, ALERION CLEAN POWER, starts the operation of the Morcone Pontelandolfo wind farm in Italian region Campania (51.75 MW)

Milan – June 2019 - ALERION CLEAN POWER, subsidiary of FRI-EL GREEN POWER, starts the commissioning of a wind farm, operated through Eolica PM Srl, located in the municipalities of Morcone and Pontelandolfo (province of Benevento). The installed power is 51.75 MW.

With this additional wind farm, the FRI-EL Group reaches 971.25 MW of gross installed capacity.

For further information www.alerion.it